LA LITERA – ARAGÓN – ESPAÑA
23-ES-TG-LA MELUSA is an EU project that is part of the overall project of 140 hectares of the ‘LA MELUSA-TAMARITE’ Logistics Platform, declared as a Project of General Interest (PIGA) by the Government of Aragon in July 2022.
The objective of this project is to improve the Trans-European Transport (TEN-T) Network through the construction of a new multimodal railway terminal, within the «LA MELUSA-TAMARITE» Global Logistics and Industrial Platform, in the municipality of Tamarite de Litera (Huesca, Spain), located on the comprehensive TEN-T Network and in proximity to the Mediterranean core network corridor. This new railway terminal with an international vocation will be connected with the Spanish railway network.
With an approximate area of 17 hectares, the terminal will allow the loading and shipment of goods internationally, mainly related to the agri-food production sector, which is very important in the area, contributing to the EU’s objective of reducing its dependence on raw materials from abroad and promoting a modal shift from road to rail.
The project will develop the activities corresponding to the development of the new intermodal railway terminal «PONENTIA – LA MELUSA».
The new platform is located in Southern Europe.
Specifically in Spain, between the regions of Aragon and Catalonia.
In the municipality of “La Litera”.
With direct access to the A-22 highway (exits 22 and 27)
20 kilometers from the nearest airport.
Barcelona Airport and Port
185 km.
Port and city of Tarragona
85 km.
City of Huesca
85 km.
City of Lleida
30 km.
City of Zaragoza
160 km.
Intermodal Logistics Platform of La Litera
The development of the railway terminal linked to the industrial estate offers an opportunity for intermodal logistics, and the reduction of CO2 emissions.
165,000 m2 of surface area and capacity for 150,000 TEUs/year.
Huge of Railway place 800 linear meters.
5 reception/dispatch tracks.
4 loading lanes operated by overhead cranes.
800-meter maneuvering line.
4 locomotive storage tracks (650m/track).
Customs Agents.
Daily connection with the United Kingdom, Central Europe, Eurasia (Silk Road) and different Spanish ports.
Forecast: 6 trains daily (Phase 1) and up to 24 trains (Phase 2).
75% electric traction on routes.
Specialization in temperature-controlled transport.
Video-monitored parking lot for 200 trucks.
Presentation of the “La Melusa” Ponentia Railway Terminal project at the CEF – Transport
Approval by the European Commission of the application.
Start of the “La Melusa” Ponentia Railway Terminal project
Completion of the “La Melusa” Ponentia Railway Terminal project
Gobierno de Aragón: Declaración de inversión de interés autonómico y de interés general de Aragón.
Autorización de conexión a la red ferroviaria de interés general.
Gobierno de Aragón: Aprobación inicial plan de interés general de Aragón.
Carta de apoyo Estado Español para la Terminal Ferroviaria Ponentia.
Gobierno de Aragón: Aprobación definitiva plan de interés general de Aragón.
Inicio de obras de urbanización plataforma industrial.
Inicio de obras de la Terminal Ferroviaria.
Inicio de obras edificios en parcelas industriales y logísticas (posibilidad de simultaneidad de licencias).
Inicio operaciones ferroviarias.
Final de obras plataforma industrial y logística.